|AJD Intranet | Site Map | Careers|

 

| Home | Services | Projects | MarketsResources | Contact |

 

Representative Projects

Term Agreement for Surveying

Region 11

Back to Project List
Printer Friendly

 

 

Key Project Elements

  • Control Networks
  • Topographic Surveying
  • Hydrographic Surveying
  • Digital Terrain Modeling
  • Acquisition Mapping
  • GPS and Total Station Surveying
  • Photogrammetric Control
  • Monument  
  •  
Project Description
DeBruin was retained by the New York State Department of Transportation to establish secondary horizontal and vertical control on the project site using GPS, total stations, and differential leveling techniques. Over 100 horizontal and vertical control points were established to be used as the basis of future survey work on the Bronx River Parkway. The project limits were the Bronx-Westchester County line at the north end and Rosedale Avenue at the south end. Extensive survey reports and reference diagrams were generated to document our work.

image

 Copyright 2010, DeBruin Geomatics, LS, PE, PC